Shows method of constructing Culvert in lengths. In this view can be seen the temporary timber dam holding back water in the goit, together with the timber chutes on each side to carry water past the length under treatment.
The excavation has been completed and the timber forms for the invert are being fixed. Behind can be seen the laying of the concrete invert and also the end of the shuttering for the side walls.